DOLT

Demand Over Lead Time

The projected usage of a component or other material over the replenishment lead time. A predictable usage rate is assumed when calculating lot sizes and reorder levels based on lead time demand.


DOLT

Demand Over Lead Time

The projected usage of a component or other material over the replenishment lead time. A predictable usage rate is assumed when calculating lot sizes and reorder levels based on lead time demand.

Použito v metodice